Great to hear about the work being done, but I still struggle to see why all this means a whole network shut down. Why can’t these works be done at night and only have partial shutdowns during the day? The Western Line has continued operating with only one track between Kingsland and Grafton so why can’t this be the norm rather than a whole network shutdown. We need to ensure that rail can be relied on which will never happen when the whole network shuts down.