I think by doing a 1/2 and 1/2 , i.e bring the rail platforms down to west coast road level , and raise the road to the other 1/2 required they would be able to squeeze a grade seperation in.
I suspect the only solution to ease congestion at Glenview Road railway crossing, until grade separation is built (elsewhere as won't fit there), is to close it.
Review #90! Thanks for your mahi on this Grady!
Cheers Malcom, heres to many more!
I think by doing a 1/2 and 1/2 , i.e bring the rail platforms down to west coast road level , and raise the road to the other 1/2 required they would be able to squeeze a grade seperation in.
I suspect the only solution to ease congestion at Glenview Road railway crossing, until grade separation is built (elsewhere as won't fit there), is to close it.